Three structures are placed on an alignment. Let’s start by looking at the 110kV model. Whereas for the 11kV line, the jumpers are considered to be rigid and loop over the top of the connecting strain insulators. The conductor is Partridge and is strung at a tension of 15000 (Lbs). For the purpose of this example, the main difference between the two lines is that the 110kV line can be considered to be flexible and the jumpers hang vertically down below the insulators. The convention will be followed by PLS-CADD stringing the other phases from 12 to 2 and from 13 to 3. List the weather cases you want to analyze and select the 'Run SAPS/SAGSEC analysis' option. If you search for pls cadd crack, you will often see the word crack. Open your project within PLS-CADD Go to Criteria/SAPS-SAGSEC Export. PLS-CADD-LITE is a Shareware software in the category Miscellaneous developed by. This provides our transmission and distribution case respectively. Procedure for integrating SAPS or SAGSEC graphics within PLS-CADD: Note: Portions of the procedure below rely on features introduced in PLS-CADD 4.67, SAPS 5.09 and SAGSEC 4.09. To do this lets first consider to two powerlines, a 110kV line and an 11kV line. As the subject got a lot of interest previously, I wanted to follow up and look at how this new functionality actually works in practice. I am pleased to say that this capability is now available in the latest update of PLS-CADD™ (v14.50). I also discussed that PLS-CADD™ were looking at how to incorporate more accurate jumper modelling in future versions. Pls Cadd 94fbr A file with the PLS file extension is most likely an Audio Playlist file. In a recent article I looked at the difficulties and inherent issues in modelling jumpers on transmission and distribution networks.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |